Completion Year | 2022 |
Number of Blocks | 1 |
Number of Storeys | 5 |
Type | Commercial |
Project Developer / Owner | Olympian City 2 Management Company Limited |
Environmental Consultant | Telemax Environmental and Energy Management Limited |
A smart AI control building management system is implemented in Olympian City 2 for controlling and monitoring the electricity usage of chiller system. The smart AI control can optimize the setting of chiller plant to make a balance between the electricity usage and comfortable ambience of Shopping Arcade so that energy saving can be achieved in the meantime.
Motivations to go “green” and commitment to Advancing Net Zero
Sustainability is integral to our business and is integrated into all aspects of our operations. As a responsible corporate citizen, we are committed to Creating Better Lifescapes, which we bring to life
through our work under the six pillars of Green, Wellness, Design, Innovation, Heritage & Culture and Community.
Health and Well-being
Regular building user satisfaction survey including topics for indoor comfort are conducted. Follow-up actions were taken if there is any discomfort reported in the survey. Sufficient fresh air and exhaust air provision are provided to ensure the good air quality in the air quality in the project building. On-site measurements for thermal comfort and indoor air quality (IAQ) were conducted and achieved good class of Hong Kong IAQ Certification Scheme. IAQ in car parks comply with the recommended CO and NO 2 level as stipulated in ProPECC PN 2/96. Color rendering index of interior lighting system in landlord areas comply with the criteria given in CIBSE standard.
Smart elements
Power analyzers are provided for monitoring energy use and power analysis of major E&M equipment, e.g. chiller plant. BMS system is provided for air side, water side, cooling load and lighting control. Motion sensor are provided for controlling lighting equipment in some not normally occupied areas.
Green Products
Environmentally friendly products are widely used in the project (e.g. refrigerant, fire suppression material, detergent and etc.). Refrigerant (R134a) with low GWP and ODP is adopted for all chillers in the project building. Fire suppression materials avoiding the use of ozone depleting substances e.g., CO2 type fire extinguishers are adopted. Over 10% of the detergent used on site are certified as green product e.g., Hong Kong Green Label.
Completion Year | 2022 |
Number of Blocks | 1 |
Number of Storeys | 5 |
Type | Commercial |
Project Developer / Owner | Olympian City 2 Management Company Limited |
Environmental Consultant | Telemax Environmental and Energy Management Limited |