New Buildings V1.2
Final Gold

Overall Score

The proposed development is located at Wan O Road, Tseung Kwan O. It comprised four numbers residential towers which are 45, 46, 47 and 49 storey height, one 2-storey clubhouse and 2-storey basement car park. There are 2172 residential units in the development. Various measures are proposed to mitigate existing adverse environmental conditions to achieve a comfortable environment.

Green Features

Site Aspects

  • The design of the site 100% fulfills the Urban Design Guidelines presented in Chapter 11 of the Hong Kong Planning Standards and Guidelines published by Planning Department. The site concerns not only the total visual effect of building masses but also connection with people and places.
  • Conduct Ecological impact assessment to assess the impact on habitat
  • 30% of site area are covered with greenery

Materials Aspects

  • Adapt non-CFC based refrigerants and building fabric
  • 25.8% of building materials were manufactured within 800km from the site to reduce the environmental impacts arising from transportation

Energy Use

  • Adapt high-COP AC equipment & lift system
  • Over 17% energy saving is achieved compare with BEC statutory requirement
  • Independent commissioning authority was engaged during the testing and commissioning process to ensure the design intent and environmental performance are achieved

Water Use

  • Use water-efficient sanitary fittings & electrical appliances
  • Reduce annual water consumption by 30%
  • Reduce annual effluent discharge by 50%

Indoor Environmental Quality

  • Achieved “Good Glass” IAQ objectives at Clubhouse
  • Adequate ventilation is provided in common areas to maintain comfort level
  • 3 different division in Barrier Free Access 2008 to enable persons with disability to make full use of the basic facilities in a building without assistance and undue difficulties

Innovations and Additions

  • Car park spaces are equipped with EV chargers
  • Twin tank provision for both potable water and flushing water


Project Details

Completion Year 2018
Number of Blocks 4
Number of Storeys Tower 1A & 1B (45), Tower 2A & 2B (46), Tower 3A & 3B (47), Tower 5A & 5B (49)
Type Residential

Project Team

Project Developer / Owner Globaluck Limited
Project Manager Sun Hung Kai Properties Ltd.
Architect Ronald Lu & Partners (Hong Kong) Limited
Landscape Architect Sun Hung Kai Architects And Engineers Ltd.
M&E Engineer Sun Hung Kai Architects And Engineers Ltd.
C&S Engineer Ove Arup & Partners Hong Kong Limited
Facade Consultant Alpha Consulting Limited
Main Contractor Yee Fai Construction Co. Ltd.
Quantity Surveyor Langdon & Seah Hong Kong Limited
Sustainable Design Consultant Ramboll Environ Hong Kong Limited
Environmental Consultant Ramboll Environ Hong Kong Limited
Acoustic Consultant Westwood Hong & Associates Limited
Facility Manager MTR Corporation Limited
Back

  • 1/F, Jockey Club Environmental Building, 77 Tat Chee Avenue, Kowloon Tong, Hong Kong.
  • +852 3994 8888
  • [email protected]

  • © 2024 Hong Kong Green Building Council Limited. All rights reserved.
  • Disclaimer

Stay connected:




© 2024 Hong Kong Green Building Council Limited. All rights reserved.
Disclaimer