Completion Year | 2021 |
Number of Blocks | 2 |
Number of Storeys | 2 floors carpark (G/F to 1/F) 1 floor Clubhouse (5/F) T1 and T2: 56 floors Residential units (6/F to 70/F) |
Type | Restaurants |
Project Developer / Owner | Ventures Smart Limited |
Project Manager | LOHAS Seven Project Management Limited |
Architect | P&T Architects Limited |
Landscape Architect | ADI Limited |
M&E Engineer | Meinhardt (M&E) Limited |
C&S Engineer | Ove Arup & Partners Hong Kong Ltd |
Facade Consultant | Meinhardt Façade Technology (HK) Ltd |
Main Contractor | China Overseas Building Construction Limited |
Quantity Surveyor | Arcadis Hong Kong Ltd. |
Sustainable Design Consultant | WSP (Asia) Limited |
Environmental Consultant | WSP (Asia) Limited |
Acoustic Consultant | WSP (Asia) Limited |
Facility Manager | MTR Corporation Limited |
MONTARA is a sustainable residential building located at Tseung Kwan O LOHAS Park with a total gross area over 750,000 square feet. The development is being awarded Final Gold rating in BEAM Plus.
The development strives to achieve perfection in all aspects to keep pace with the growing business community. MONTARA provides a variety of environmentally friendly provisions which not only help to minimize the carbon footprint, but also enhance the well-being of end-users and to reduce operation cost.
MONTARA presents achievement of sustainability initiatives and fosters green and thriving community through engagement. It also presents effectiveness of design in terms of adaptability, safety and efficiency in functionality, maintenance, carbon neutrality and energy conservation.
Over the years, it has been Wheelock Properties’ unwavering commitment to foster harmonization and connectivity with the surrounding natural environment. We actively seek opportunities to integrate various environmentally friendly and climate-resilient practices in design and planning stages. Our award-winning residential and commercial developments have demonstrated our environmental stewardship, innovative use of technology and dedication to build high-quality sustainable properties.
Wheelock Properties strives for BEAM Plus Gold certification for all buildings and LEED Gold certification for all commercial buildings but we do not stop at mere compliance with environmental laws and regulations. We also closely monitor our environmental performance and work closely with our contractors to minimize carbon footprint.
Green building design - Circa 50% site area of greenery including green roof and wall. Roof area is covered by highly reflective materials and green roof with less solar heat absorption, Optimal building form design to achieve good surrounding microclimate
Energy-Use - Higher Coefficient of Performance inverter split type for Residential unit and higher Coefficient of Performance VRV (variable refrigerant volume) Air conditioning units for clubhouse and environmentally-friendly refrigerant used. Equipped with facilities for EV charging at all the parking spaces in order to reduce carbon emissions.
BioZone air purification technology – To enhance health and well-being of the residents, BioZone PhotoPlasma™ technology is installed at Clubhouse and each lobby of residential floor. It can actively eliminate airborne and surface microorganisms. It can also decompose volatile organic compounds (VOCs) and other organic compounds.
Interactive E-information booth – All notices for residents are uploaded in E-information booth installed in Clubhouse and every tower entrance lobby to reduce the use of papers. Residents can book clubhouse facilities anytime using these Interactive E-information booths as well.
Clubhouse facilities booking Mobile App – Residents can book clubhouse facilities anytime and anywhere via mobile app.
Completion Year | 2021 |
Number of Blocks | 2 |
Number of Storeys | 2 floors carpark (G/F to 1/F) 1 floor Clubhouse (5/F) T1 and T2: 56 floors Residential units (6/F to 70/F) |
Type | Restaurants |
Project Developer / Owner | Ventures Smart Limited |
Project Manager | LOHAS Seven Project Management Limited |
Architect | P&T Architects Limited |
Landscape Architect | ADI Limited |
M&E Engineer | Meinhardt (M&E) Limited |
C&S Engineer | Ove Arup & Partners Hong Kong Ltd |
Facade Consultant | Meinhardt Façade Technology (HK) Ltd |
Main Contractor | China Overseas Building Construction Limited |
Quantity Surveyor | Arcadis Hong Kong Ltd. |
Sustainable Design Consultant | WSP (Asia) Limited |
Environmental Consultant | WSP (Asia) Limited |
Acoustic Consultant | WSP (Asia) Limited |
Facility Manager | MTR Corporation Limited |