• Achievement of green management practices for ISO 14001, ISO 50001, OHSAS 18001 and waste management

  • Upgrade of existing open refuse storage areas and addition of mechanical ventilation system

  • Installation of energy-saving electronic ballast for public lighting

  • Installation of water saving devices for public and estate office toilets

  • Lift Addition Project to enhance Barrier Free Access

  • ‘Total Maintenance Scheme’ provides comprehensive maintenance and repair services

  • ‘Responsive In-flat Maintenance Services’ provides enhanced and responsive maintenance services inside tenant flats

  • Green Roof for the Podium of Shopping Centre

  • Information platform displays energy consumption

  • Tenants’ education and community engagement to arouse environmental awareness


Existing Buildings V1.2
Final Platinum

Overall Score
Site Aspects
Materials Aspects
Energy Use
Water Use
Indoor Enviro. Quality
Credit(s)    Innovations and Additions

To benchmark the environmental performance of existing public rental housing estates using scientific building assessment method,  Kwai Shing West Estate was selected by the Hong Kong Housing Authority as pilot for implementing BEAM Plus.   The estate was completed in 1975 and to enhance the environmental performance and promote sustainable living, improvements had been tied in with the estate improvement programme and adopted sustainable designs and installations such as environmentally-friendly materials, energy-efficient products and water saving devices to reduce consumption, green management practices and operational guidelines, simulations and audits to assess energy performance, and an information platform displaying energy consumption to arouse residents’ environmental awareness, together with innovative maintenance schemes to proactively identify and repair building defects.  The improvements complied with requirements of BEAM Plus Version 1.2 for Existing Buildings and Kwai Shing West Estate had achieved provisional Platinum rating in June 2014 and subsequently Final Platinum rating in October 2015.  It is the first existing building to receive this award under the existing building category.

Green Features

Green strategies adopted in Kwai Shing West Estate include:

  • Green management practices and operational guidelines to comply with environmental and energy management certification requirements such as ISO 14001, ISO 50001, OHSAS 18001, as well as waste management
  • Building upgrades such as installation of water saving devices and energy-saving electronic ballast for public lighting
  • Building improvements such as upgrading existing open refuse storage areas and addition of mechanical ventilation system, barrier free access improvements and new lift additions
  • Regular monitoring of environmental performance such as energy and carbon audits
  • Implementation of innovative and proactive maintenance programmes such as ‘Total Maintenance Scheme’ and ‘Responsive In-flat Maintenance Scheme’
  • Green roof and vertical greening for low rise structures
  • Tenants’ education and community engagement to arouse environmental awareness

Story

Overcoming Existing Challenges

Before After

It is important to identify existing constraints and challenges before embarking on the BEAM Plus pilot project.  Kwai Shing West Estate was built in 1975 and some building design could not fulfill the current BEAM Plus requirements. For example, the open refuse areas do not comply with the prerequisite requirements under ‘Material Aspects’ category.  Upgrading works and addition of independent mechanical air filtration system had been carried out and under the existing estate situation, modification works had been carefully planned to mitigate disturbance to tenants and at the same time ensure uninterrupted building services operations.

Managing Green Initiatives

The Hong Kong Housing Authority makes ‘green living’ an underlying theme of all the estate management work.  Moving forward in this direction, we have obtained international certifications in ISO 14001 Environmental Management System, ISO 50001 Energy Management System and OHSAS 18001Occupational Health and Safety Management System, as well as waste management system.  Implementation of these green initiatives includes management practices and operational guidelines for routine cleansing, security, waste management, energy monitoring as well as planned maintenance and improvement works.

Creating Innovations 

Timely maintenance and proper improvement works not only ensure a safe and pleasant living environment for the residents, but also sustain the lifespan and economic value of the existing housing estates.  ‘Total Maintenance Scheme’ provides comprehensive maintenance services for inspection and repair of tenant flats.  In ‘Responsive In-flat Maintenance Services’, frontline staff register maintenance requests directly from tenants and set repair process in motion quickly.  Through these programmes, we are able to constantly upgrade the estate facilities to meet residents' needs.

Engaging the Community

 

Public housing estates function as complete communities and effective channels of communication with stakeholders become important to promote community spirit, grasp sense of belonging, and achieve common community goals.  Striving for enhancement in environmental performance of Kwai Shing West Estate, we display the consumption of electricity, gas and water use at domestic blocks to arouse tenants’ environmental awareness.  We have also been closely involved in organizing and promoting public engagement to strengthen and enhance our communication channels and services.

Interview


Project Details

Completion Year 2016
Number of Blocks 10
Number of Storeys 7 - 25
Type Residential

Project Team

Project Developer / Owner Hong Kong Housing Authority
Project Manager Hong Kong Housing Authority
Architect Hong Kong Housing Authority
M&E Engineer Hong Kong Housing Authority
C&S Engineer Hong Kong Housing Authority
Main Contractor New Hopes Construction Co. Limited
Sustainable Design Consultant Business Environment Council Limited
Facility Manager Hong Kong Housing Authority
Back

  • 1/F, Jockey Club Environmental Building, 77 Tat Chee Avenue, Kowloon Tong, Hong Kong.
  • +852 3994 8888
  • [email protected]

  • © 2024 Hong Kong Green Building Council Limited. All rights reserved.
  • Disclaimer

Stay connected:




© 2024 Hong Kong Green Building Council Limited. All rights reserved.
Disclaimer