• Installation of solar bollard lights for planters at Residence Bel-Air green roof garden

  • Installation of LED down lights at Club Bel-Air Bay Wing and Peak Wing since 2015 as part of our commitment for Bel-Air sustainable living

  • Rooftop garden above Club Bel-Air mitigates heat island effect

  • Installation of energy saving heat pumps for spa pools at Club Bel-Air Bay Wing and Club Bel-Air Peak Wing

  • Installation of energy saving heat pumps for spa pools at Club Bel-Air Bay Wing and Club Bel-Air Peak Wing

  • Main gate to Bel-Air on the Peak, Villa Bel-Air and Bel-Air No.8 (Phase 4 - Phase 6)

  • Landscaped podium garden providing an leisure commute for residents from Phase 4 and 6

  • Bel-Air No. 8 - Curving facades reflect the flowing pools of the landscaped podium and the sea beyond

  • Bel-Air No. 8 Outdoor Pools - Bel-Air residents luxuriate in the vast expanse of panoramic seaview and greenery which can promote wellness.


Existing Buildings V2.0 (Selective Scheme)
Excellent

Management
Pacific Century Premium Developments Limited  
Bel-Air




Bel-Air is a large-scale luxury residential development located on Southside of Hong Kong Island, comprises six residential phases including 30 towers and 47 houses with a total of CFA 375,548m² (building coverage of 20.11%).  Over 330,000m² of landscape area, which represents more than 85% of green coverage. Bel-Air was first launched in 2003. The entire six phases consist of 2,771 residences. The first phase completed in 2004 whereas the final phase completed in 2008.

Bel-Air residents luxuriate in an incredible seaview and a beguiling view of our concrete jungle. For years, Bel-Air has introduced various measures in water conservation, energy saving and waste management so as to continuously promote a more sustainable built environment in Bel-Air.

Bel-Air is managed under an award-winning professional property management team, Island South Property Management Ltd., and has attained Excellent Grade under Management Aspect in BEAM Plus Existing Buildings V2.0 Selective Scheme.

Green Features

  • 330,000m² of landscape area (About 85% of green coverage)
  • Overall 50% of sky garden, podium and roof area with greenery to mitigate the Urban Heat Island Effect.
  • Sky gardens coupled with refuge floor in high-rise buildings provide greener and leisure space for enjoyment of residents.
  • Twin-tank water supply system minimizes disruption to residents and reduce water wastage during maintenance
  • Use of energy saving lights like T5 fluorescent tube and LED lamp for public area
  • Provision of 100% coverage for the power supply system for the installation of EV charger to all private capark spaces;
  • Installation of solar film at tower lobbies and clubhouse premises for reduction of sun’s heat, harmful UV rays or glare;
  • Installation of food waste decomposer to facilitate the food waste recycling;
  • Implementation of year round waste reduction and recycling programme and activities
  • The common areas consistently comfort with Indoor Air Quality (IAQ) certification scheme for over 10 years.
  • Provision of staff canteen for onsite staff members to promote employees’ wellness whilst reducing wastage on food and disposable utensils.


Project Details

Completion Year 2004-2008
Number of Blocks 30 towers and 47 houses
Number of Storeys Total 1,158 floors among 30 towers
Type Residential

Project Team

Back

  • 1/F, Jockey Club Environmental Building, 77 Tat Chee Avenue, Kowloon Tong, Hong Kong.
  • +852 3994 8888
  • [email protected]

  • © 2024 Hong Kong Green Building Council Limited. All rights reserved.
  • Disclaimer

Stay connected:




© 2024 Hong Kong Green Building Council Limited. All rights reserved.
Disclaimer