AXA Southside is a 28-storey Grade A commercial building. It offers flexible layouts ranged from 1,647 to 12,755 sq.ft and equipped with 5 passenger lifts and 2 shuttle lifts serving G/F to 2/F. The building is built with high quality furnishes and environmentally sustainable features and deserving the BEAM Plus Silver rating awarded by the Hong Kong Green Building Council. Moreover, the building has 67 parking with disable and 5 nos. EV charging facilities at the two basement floors. It also has a sky garden organic farming area and a podium landscaped garden.

AXA Southside is just about 1-min walk from Wong Chuk Hang MTR station and only takes about 15 mins. time to reach the prime locations in HK Island including Central, Admiralty and Causeway Bay. It is close to the public stadium and swimming pools and recreation spots such as the marina club and the floating restaurant.

Green Features

Site Aspects

  • Basic services and recreational facilities are located within 500m walking distance
  • Appropriate planting and landscape is growing on site
  • Sustainable commercial building design has been incorporated

Materials Aspects

  • Non-chlorofluorocarbon (CFC)-based refrigerants are used
  • Refuge sorting room and recycle material managing facilities are provided
  • Materials for building fabric and services are non-ozone depleting substances

Energy Use

  • Facilities are complying to EMSD’s BEC 2012 (Rev.1)
  • Low energy consumption facilities are selected for ventilation and lighting system
  • Façade with lower solar heat gain are used

Water Use

  • Water quality monitoring work is regularly carried out
  • Water efficient sanitary fitments are used
  • Water saving practice is adopted in daily operation

Indoor Environmental Quality

  • Adequate security provision is adopted
  • Hygienic plumbing fitment is adopted
  • Adequate indoor ventilation is adopted

Innovations and Additions

  • BEAM professional is engaged to design the sustainable system for the building


Project Details

Completion Year 2017
Number of Blocks 1
Number of Storeys 28 (including 2 basement floors)
Type Commercial

Project Team

Project Developer / Owner Wisefield Enterprises Limited
Project Manager LCK Architects Limited
Architect LCK Architects Limited
Landscape Architect Constance Design Studio Limited
M&E Engineer Thomas Anderson & Partners Consulting Engineers Limited
C&S Engineer JMK Consulting Engineers Limited
Facade Consultant Alpha Consulting Limited
Quantity Surveyor Rider Levett Bucknall Limited
Sustainable Design Consultant Ramboll Environ Hong Kong Limited
Facility Manager Savills Property Management Limited


Back

  • 1/F, Jockey Club Environmental Building, 77 Tat Chee Avenue, Kowloon Tong, Hong Kong.
  • +852 3994 8888
  • [email protected]

  • © 2024 Hong Kong Green Building Council Limited. All rights reserved.
  • Disclaimer

Stay connected:




© 2024 Hong Kong Green Building Council Limited. All rights reserved.
Disclaimer