30-classroom Primary School at Site KT2c, Development at Anderson Road, Kwun Tong

  • External View_ Anderson Road


New Buildings V1.2
Provisional Gold

Overall Score
Site Aspects
Materials Aspects
Energy Use
Water Use
Indoor Enviro. Quality
Credit(s)    Innovations and Additions

Primary schools may be just a “first day of school” for many kids, but the experience will provoke a giant leap in a child’s intellectual development. The built environment within a primary school shall encourage exploration as well as stimulate the development of the mind. This new school development consist of 30 classrooms along with many special teaching facilities, with the design emphasizing on the extreme level differences from the existing topography to create an ever-changing and engaging, yet welcoming sanctuary for the students to grow into. The development also adopts MiC for the typical classrooms, toilets and pantry.

Green Features

Site Aspects

  • The project demonstrated a proactive approach to achieve greater integration of site planning and design issues

  • Wind amplification report and daylight simulation are carried out and fulfilled relevant requirement.

  • 55.21% of the total roof area was covered by roof materials with SRI higher than 78 and vegetation

  • Environmental management to minimize air, noise and water pollution during construction

Materials Aspects

  • MiC and sustainable forest products are adopted.

  • Non-CFC based-refrigerants were adopted in HVAC systems

Energy Use

  • 16.4% annual energy saving is achieved. High energy efficient AC with better COP and high efficiency lighting and lifts to reduce annual energy consumption

  • 40 nos of PV panels are adopted, which can offset 2.5% of annual energy consumption.

Water Use

  • 58.89% reduction in annual sewage volume from the use of water efficient devices.

  • 75.59% of estimated annual water saving from the use of water efficient devices

Indoor Environmental Quality

  • Enhanced designs for barrier free

  • 30% increased ventilation is provided.

  • Good quality of interior lighting is provided

  • Good Class IAQ

Innovations and Additions

  • Twin Tank for potable and flushing water supply


Project Details

Completion Year 2024
Number of Blocks One
Number of Storeys Five
Type Government, Institutional and Community
Total Site Area 7,130 sqm

Project Team

Developer DEVB
Project Manager ArchSD
Architect Andrew Lee King Fun & Associates Architects Ltd
Sustainable Design Consultant Allied Environmental Consultants Ltd.
Environmental Consultant Allied Environmental Consultants Ltd.
C&S Engineer Siu Yin Wai Associates Ltd.
M&E Engineer J. Roger Preston Ltd.
Landscape Architect ADI Ltd.
Quantity Surveyor Arcadis Hong Kong Ltd
Acoustic Consultant Allied Environmental Consultants Ltd.
Main Contractor Chun Wo Construction Holdings Company Limited
Back

  • 1/F, Jockey Club Environmental Building, 77 Tat Chee Avenue, Kowloon Tong, Hong Kong.
  • +852 3994 8888
  • [email protected]

  • © 2024 Hong Kong Green Building Council Limited. All rights reserved.
  • Disclaimer

Stay connected:




© 2024 Hong Kong Green Building Council Limited. All rights reserved.
Disclaimer