• Bank of China Centre


    Existing Buildings V2.0 (Comprehensive Scheme)
    Final Platinum

    Overall Score
    Management
    Site Aspects
    Materials and Waste Aspects
    Energy Use
    Water Use
    Indoor Enviro. Quality
    Credit(s)    Innovations and Additions

    Bank of China Centre, a 26-storey office building with approximately 300,000 square feet located at 11 Hoi Fai Road, West Kowloon, was inaugurated in 2001. Bank of China Centre adopted a series of energy saving measures, including, retro commissioning to E&M system, optimization of central air-conditioning plant, introduction of environmentally friendly and energy-saving lamps and water-saving equipment, etc.

    Green Features

    Management

    • Comply with ISO 14001 Environmental Management System (EMS) Certification
    • Comply with ISO 50001 Energy Management System (EnMS) Certification
    • Comply with ISO 45001 Occupational Health and Safety Management Systems (OHSAS) Certification

    Site Aspects

    • Provide sufficient facilities/services for Corporate Social Responsibility (CSR)
    • Provide sufficient amenities for operation and maintenance
    • Provide sufficient enhanced barrier free access provisions

    Materials and Waste Aspects

    • Provide  sufficient waste recycling facilities
    • Develop and implement an effective Waste Management Plan

    Energy Use

    • Maintain on-going commissioning to electrical system
    • Conduct Retro Commissioning
    • Provide LED lighting with motion detection sensor and dimming control
    • Energywi$e Certification – Excellent Level

    Water Use

    • Adopt faucet aerator to achieve water saving
    • Adopt plumbing fixture with Water Efficiency Labeling Scheme (WELS) Class 1
    • Comply with Quality Water Supply Scheme for Building – Fresh Water (Management System) Gold and Quality Water Supply Scheme for Building – Flush Water Silver

    Indoor Environmental Quality

    • Indoor Air Quality Certification Scheme – Excellence Class
    • Conduct periodic customer survey to monitor the indoor environment

    Innovations and Additions

    • Wastewi$e Certification – Good Level

    ..

    Story

    Implementing Green Operations

    We are committed to always minimising the potential environmental impact of our business operations and take measures towards low-carbon and energy efficient operations. Besides, we established 5 green operation management goals They are energy, carbon emissions, water consumption, paper consumption and wastes disposal, managing the environmental footprint of our operations is also implemented.

     

    Measures for energy saving and emission reduction

    To cope with climate change, we have put in place measures for energy saving, carbon reduction and emission reduction in order to eliminate unnecessary carbon emissions from our daily operations and gradually move towards carbon neutrality:

     

    Implementing smart energy management

    We have applied retro-commissioning (RCx) to chillers system of Bank of China Centre to enhance energy efficiency continuously. We also keep promoting the development of renewable energy such as carrying out feasibility study of installation of solar panels and wind power technology.

    To modify the fitting out work, we are gradually introducing highly energy-efficient equipment and green products, such as energy saving lighting, high-efficiency air-conditioning systems, water-saving sanitary appliances, electrical appliances with Grade 1 energy labels, etc.

    We are also adopting natural lighting in our lobbies and installing solar insulation window films to reduce solar gain, in order to save electricity and enhance the efficiency of chiller system.


    Project Details

    Number of Blocks 1
    Number of Storeys 29 Storeys above ground (plantrooms at B1/F and B2/F)
    Type Commercial

    Project Team

    Project Developer / Owner Bank of China (Hong Kong) Limited
    Project Manager Bank of China (Hong Kong) Limited
    Facility Manager Sun Chung Property Management Company Limited
    Back

    • 1/F, Jockey Club Environmental Building, 77 Tat Chee Avenue, Kowloon Tong, Hong Kong.
    • +852 3994 8888
    • enquiry@hkgbc.org.hk

    • © 2025 Hong Kong Green Building Council Limited. All rights reserved.
    • Disclaimer

    Stay connected:




    © 2025 Hong Kong Green Building Council Limited. All rights reserved.
    Disclaimer